The Subway Power House

Moderators: John, Sharon, Fossil, Lucky Poet, crusty_bint, Jazza, dazza

Postby glasgowken » Fri Jun 30, 2006 5:53 pm

They aren't equally spaced, here's a diagram with show the distances in feet, with the gradient and depth, along the line.

Cick below.
http://img.photobucket.com/albums/v379/ ... ayplan.jpg


The gripper mechanism. A wheel was turned to grip & release smoothly. and a lever released the cable quickly when the train passed over the point where the cable entered the tunnel at Scotland St. It took a good bit of skill & judgement, to operate. The cables ran at a constant 13 MPH, and both were the same length, 11650 yards, any difference due to tunnel length was taken up on the cable drums at the power house.

Image

Strangely enough the original idea was to have all trains spaced along the cable and permanently attached. The cable would then stop & start when the trains were aligned with each station. That idea was turned down by the House of Commons at the Bill stage. You can imagine the problems with slack, and trying to keep the trains in line with the stations. That plan would have also required the stations to be equally spaced.

(Maybe this thread should be merged with the main Subway thread ?)
GK
User avatar
glasgowken
Third Stripe
Third Stripe
 
Posts: 4477
Joined: Mon Oct 03, 2005 12:59 am
Location: Glasgow

Postby viceroy » Fri Jun 30, 2006 6:18 pm

Ah, so the lever was for quick release at the crossover and then gripping once the crossover was cleared. I wondered about that. Where would the wheel be for operating the gripper in the picture? The gripper in the Transport Museum has the wheel fitted at one end making it look as if the mechanism should be mounted vertically, not horizontally. I've examined it several times but cannot really figure this out, not being all that mechanically inclined.
User avatar
viceroy
Third Stripe
Third Stripe
 
Posts: 1048
Joined: Sun Jan 30, 2005 8:23 pm
Location: Glasgow no more

Postby glasgowken » Fri Jun 30, 2006 7:18 pm

The gripper was fitted on the front bogie, I think the wheel was fitted directly to the Transport Museum example for demonstration only.
This plan shows the hook up (although it's not too clear).

http://glasgowtransport.co.uk/ug_car_plan1.jpg
GK
User avatar
glasgowken
Third Stripe
Third Stripe
 
Posts: 4477
Joined: Mon Oct 03, 2005 12:59 am
Location: Glasgow

Postby Schiehallion » Fri Jun 30, 2006 7:26 pm

Pgcc93 wrote:The question is: How much longer would the rope have been on the outer circle compared to the inner? Over to you Math heads :)


To find the circumference you multiply the radius by 6.28 (2 x pi).

So if you 'increase' the radius from the inner circle to the outer circle then whatever the extra distance from the middle of the inner rail to the middle of the outer rail is multiplied by 6.28.

So if the distance was say 6 feet then you'd need 37.68 feet of extra cable (6 x 6.28 ).

Circles are totally mintit man, pure quality as the weans would say. We know a wider circle needs more distance, look at the staggered starts on an athletic track. But watch this, if you laid a rope along the ground all around the equator it would be 24,800 miles long. So if someone said how much extra rope would you need if the rope was say 2 foot above the ground going all around the Earth. You'd reckon with a much bigger circle it would be a fair amount?

Using the formula above (circumference = 2 x radius x pi) the extra rope needed is only 12.56 feet since we have only increased the Earth's radius by 2 foot.

The mental world of circles eh? And to think I'm usually out on a Friday night. :roll:
User avatar
Schiehallion
Third Stripe
Third Stripe
 
Posts: 1625
Joined: Sat Mar 20, 2004 9:32 pm

Postby HollowHorn » Fri Jun 30, 2006 9:06 pm

Schiehallion wrote:And to think I'm usually out on a Friday night. :roll:

Out of what, exactly :?: 8O
User avatar
HollowHorn
Third Stripe
Third Stripe
 
Posts: 8921
Joined: Mon May 23, 2005 9:59 pm
Location: Paisley

Postby glasgowken » Fri Jun 30, 2006 9:20 pm

8O I won't argue with that explanation. It takes me all day to work out the price of a pint of milk, and a loaf.
GK
User avatar
glasgowken
Third Stripe
Third Stripe
 
Posts: 4477
Joined: Mon Oct 03, 2005 12:59 am
Location: Glasgow

Re: The Subway Power House

Postby glasgowken » Sat Mar 29, 2008 6:17 pm

I noticed the power house is boarded up now, i'll try and get a couple photos on Monday.
User avatar
glasgowken
Third Stripe
Third Stripe
 
Posts: 4477
Joined: Mon Oct 03, 2005 12:59 am
Location: Glasgow

Re: The Subway Power House

Postby Buzby » Sat Apr 05, 2008 6:17 pm

Two observations - I was taken on a tour of the original electric system prior to its major remodelling and loss of Copeland Road/ Merkland St etc - the maintenance driver stopped the train between West Street and Shields road so we could look at the cable chanber which went off on the left (drivers) side of each tunnel to allow the cable to enter and leave the cable run above.

The point he made gave me considerable respect for the drivers (or 'grippers') was because there was a 6 foot gap at this point on both the inner and outer circles, and the gripper had to be completely disengaged from the cable while at speed, to coast past the gap and then re-acquire the cable on the far side for the journey on to Shields Road or West Street.

What complicated matters further, was that the cable ALSO had a join, and the grippers had to look out for the red painted section of the cable which warned them that the spliced join was shortly to arrive, and they were not to make any attempt to grip the cable here as it weakened the join. I was told some old hands could work a full shift and knew instinctively within a minute or so of then the join would be upon them, even though it moves faster (relative to their progress round the circle).

Things came to a head when passing the cable run, as they had to drop off the cable to let it rise vertically, and while coasting to the pick-up spot that the incoming cable was bathed in red - the jointed section! With no station reise of fall to smooth out the cable acquisition this was where much of the damage was done, and if the cable snapped it could take up to an hour to repair then re-tension the run.

Heady stuff!
- Raymond
Buzby
First Stripe
First Stripe
 
Posts: 43
Joined: Thu Feb 21, 2008 1:02 pm

Scotland Steet

Postby OLDFART » Thu Jun 26, 2008 11:19 am

Scotland Street nope not the museum, anybody got any pics of the old subway building next to it? my understanding it used to house winch & steam plant that pulled trollies.
OLDFART
Second Stripe
Second Stripe
 
Posts: 235
Joined: Wed Sep 12, 2007 5:17 pm

Re: Scotland Steet

Postby AlanM » Thu Jun 26, 2008 12:39 pm

An aerial shot:
Image
Who needs a six pack....when you've got a keg!!!
Image
User avatar
AlanM
Third Stripe
Third Stripe
 
Posts: 1827
Joined: Wed Sep 07, 2005 8:59 am
Location: Knightswood

Re: The Subway Power House

Postby glasgowken » Thu Jun 26, 2008 6:56 pm

I've got a few photos but i'm having problem with my image viewer. I'll add them asap.
GK
User avatar
glasgowken
Third Stripe
Third Stripe
 
Posts: 4477
Joined: Mon Oct 03, 2005 12:59 am
Location: Glasgow

Re: The Subway Power House

Postby Schiehallion » Thu Jun 26, 2008 7:28 pm

Here Ken, every time I see this in the shops I think of you. You played it yet? Even downloaded the demo version?

http://www.avanquest.com/UK/play/simula ... lator.html
User avatar
Schiehallion
Third Stripe
Third Stripe
 
Posts: 1625
Joined: Sat Mar 20, 2004 9:32 pm

Re: The Subway Power House

Postby glasgowken » Thu Jun 26, 2008 7:34 pm

Yes, i've got that. I downloaded the demo then got a patch :wink:
GK
User avatar
glasgowken
Third Stripe
Third Stripe
 
Posts: 4477
Joined: Mon Oct 03, 2005 12:59 am
Location: Glasgow

Re: The Subway Power House

Postby OLDFART » Thu Jun 26, 2008 11:09 pm

thats what it looks like now. did really know history. Managed to spend few hours inside but not sorted pics yet

ps Ken photos not showing

Image

Image
OLDFART
Second Stripe
Second Stripe
 
Posts: 235
Joined: Wed Sep 12, 2007 5:17 pm

Re: The Subway Power House

Postby Blueboy » Fri Jun 27, 2008 11:36 am

Buzby wrote:Two observations - I was taken on a tour of the original electric system prior to its major remodelling and loss of Copeland Road/ Merkland St etc - the maintenance driver stopped the train between West Street and Shields road so we could look at the cable chanber which went off on the left (drivers) side of each tunnel to allow the cable to enter and leave the cable run above.

The point he made gave me considerable respect for the drivers (or 'grippers') was because there was a 6 foot gap at this point on both the inner and outer circles, and the gripper had to be completely disengaged from the cable while at speed, to coast past the gap and then re-acquire the cable on the far side for the journey on to Shields Road or West Street.

What complicated matters further, was that the cable ALSO had a join, and the grippers had to look out for the red painted section of the cable which warned them that the spliced join was shortly to arrive, and they were not to make any attempt to grip the cable here as it weakened the join. I was told some old hands could work a full shift and knew instinctively within a minute or so of then the join would be upon them, even though it moves faster (relative to their progress round the circle).

Things came to a head when passing the cable run, as they had to drop off the cable to let it rise vertically, and while coasting to the pick-up spot that the incoming cable was bathed in red - the jointed section! With no station reise of fall to smooth out the cable acquisition this was where much of the damage was done, and if the cable snapped it could take up to an hour to repair then re-tension the run.

Heady stuff!


Buzby, thanks. That was very interesting.

BB
Blueboy
Third Stripe
Third Stripe
 
Posts: 554
Joined: Sun Dec 15, 2002 4:31 pm

PreviousNext

Return to Glasgow Chat (Coffee Lounge)

Who is online

Users browsing this forum: Google [Bot] and 21 guests